Interval type-2 fuzzy program evaluation and review technique for project management in shipbuilding


Akan E., BAYAR S.

SHIPS AND OFFSHORE STRUCTURES, cilt.17, sa.8, ss.1872-1890, 2022 (SCI-Expanded, Scopus)

  • Yayın Türü: Makale / Derleme
  • Cilt numarası: 17 Sayı: 8
  • Basım Tarihi: 2022
  • Doi Numarası: 10.1080/17445302.2021.1950350
  • Dergi Adı: SHIPS AND OFFSHORE STRUCTURES
  • Derginin Tarandığı İndeksler: Science Citation Index Expanded (SCI-EXPANDED), Scopus, Applied Science & Technology Source, Aquatic Science & Fisheries Abstracts (ASFA), Compendex, Computer & Applied Sciences, INSPEC
  • Sayfa Sayıları: ss.1872-1890
  • Anahtar Kelimeler: Shipbuilding, ship production, project management, PERT, interval type-2 fuzzy sets, LATEST STARTING TIMES, NETWORK ANALYSIS, CRITICALITY, PERT, METHODOLOGY, SYSTEM, FLOATS, TASKS, MODEL, COST
  • İstanbul Üniversitesi-Cerrahpaşa Adresli: Evet

Özet

Ship production occurs at the end of a complex process and needs effective and efficient Project Management (PM). Uncertainty in project management parameters always exists and is inevitable. The Fuzzy Set Theory is capable of capturing uncertainty through the membership functions of the parameters. We proposed a model of Interval Type-2 Fuzzy Sets (IT2FSs) Program Evaluation and Review Technique (PERT) method to literature and applied this to the production scheduling of an electric yacht to study this proposed method in terms of PM in the shipbuilding industry. The proposed model contains Forward Pass and Backward Pass calculations for IT2FPERT with a new ranking method, and a Slack Time calculation for IT2FPERT, which develops a Criticality Degree (CD) on the possible path for IT2FPERT and determines the Critical Path. Robustness tests of the proposed model were carried out by comparing results to the Critical Path Method (CPM), PERT, and PERT Simulation solutions.