Makaleler
10
Tümü (10)
SCI-E, SSCI, AHCI (6)
SCI-E, SSCI, AHCI, ESCI (7)
Scopus (6)
TRDizin (1)
Diğer Yayınlar (3)
1. Scientometric review of resource-constrained project scheduling in the construction industry
Journal of Construction Engineering, Management & Innovation (Online)
, cilt.8, sa.2, ss.146-162, 2025 (TRDizin)
7. Delay analysis in construction projects with no updated work schedules
ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT
, cilt.27, sa.10, ss.2893-2909, 2020 (SCI-Expanded, SSCI, Scopus)
8. A Review of BIM Adoption in Turkey: Practitioners' Viewpoint
International Journal of 3-D Information Modeling (IJ3DIM)
, cilt.7, sa.4, ss.59-68, 2018 (Hakemli Dergi)
9. Non-Linear Programing for Sizing Optimization of Truss Structures
International Journal of Theoretical and Applied Mechanics
, cilt.1, ss.274-284, 2017 (Hakemli Dergi)
Hakemli Bilimsel Toplantılarda Yayımlanmış Bildiriler
20
5. A Review of BIM Adoption in Turkey from Practitioners’ Viewpoint
1st Eurasian BIM Forum: Embracing the BIM Culture, İstanbul, Türkiye, 31 Mayıs 2019, ss.1-12, (Tam Metin Bildiri)
6. Delay Analysis in Construction Projects with no Updated Work Schedules
5th international Project and Construction Management Conference (IPCMC2018), Girne, Kıbrıs (Kktc), 16 - 18 Kasım 2018, ss.507-516, (Tam Metin Bildiri)
7. Non-Linear Programing for Sizing Optimization of Truss Structures
7th European Conference of Civil Engineering (ECCIE '16), Bern, İsviçre, 17 - 19 Aralık 2016, ss.1-10, (Tam Metin Bildiri)
9. Construction Management Data Warehouse Implementation for Technical Works in A Municipality
12th International Congress on Advances in Civil Engineering, İstanbul, Türkiye, 21 - 23 Eylül 2016, ss.1-5, (Tam Metin Bildiri)
10. Konut Satın Alma Kararında PROMETHEE Çok Ölçütlü bir Karar Verme Yöntemi ile Bir Uygulama
3. PROJE ve YAPIM YÖNETİMİ KONGRESİ PROGRAM, Antalya, Türkiye, 6 - 09 Kasım 2014, ss.1, (Tam Metin Bildiri)
12. Time Cost Trade Off Optimization Using Harmony Search and Monte-Carlo Method
11th INTERNATIONAL CONGRESS ON ADVANCES IN CIVIL ENGINEERING, İstanbul, Türkiye, 21 - 25 Ekim 2014, ss.1, (Tam Metin Bildiri)
13. Multi-Crıterıa Marble Selection Using An ELECTRE-AHP Application
11th INTERNATIONAL CONGRESS ON ADVANCES IN CIVIL ENGINEERING, İstanbul, Türkiye, 21 - 25 Ekim 2014, ss.1, (Tam Metin Bildiri)
14. An Efficient Genetic Algorithm Method For Large Population Solutions
15th EU/ME Workshop: Metaheuristic and Engineering, İstanbul, Türkiye, 23 - 25 Mart 2014, ss.185-187, (Tam Metin Bildiri)
17. Obtaining Optimal Activity Durations of a Construction Project from the Cash Flows Using Genetic Algorithm
Advances in Civil Engineering, Türkiye, ss.10-20, (Tam Metin Bildiri)
19. CPM KULLANILMAYAN İNŞAAT PROJELERİNDE KARŞILAŞILAN İSTİHKAK, GEÇİCİ KABUL VE FESİH İLE İLGİLİ UYUŞMAZLIKLAR VE ÇÖZÜM ÖNERİLERİ
6. İnşaat Yönetimi Kongresi, Bursa, Türkiye, 25 - 27 Kasım 2011, ss.260-273, (Tam Metin Bildiri)
20. FUZZY RULE BASED FIRE RISK ANALYSIS OF ISTANBUL’S STREETS AND AVENUES
Natural Cataclysms and Global Problems of the Modern Civilization, İstanbul, Türkiye, 19 - 21 Eylül 2011, ss.219, (Özet Bildiri)